CC-Link Partner Association

                                                                                                                   TOP
History

November 1996                  CC-Link is developed by Mitsubishi Electric

June 2000                            Mitsubishi Electric releases network
                                              specifications and CC-Link bcomes a
                                              completely Open Network

September 2000                 Partner manufacturers total 134 companies
                                              CC-Link Partner products total 240 models

November 2000                  CC-Link Partner Association (CLPA) established
                                              by 6 Foundation Partner companies as an
                                              independent organization to promote CC-Link
                                              and manage the network specifications

December 2000                 CC-Link is exhibited at its first trade show -                                              Semicon - Japan 2000
                                                         Number of booth visitors exceeds 2500

April 2001                            Six additional global CLPA offices established

May 2001                             CC-Link is recognized as an international
                                              standard for sensor/actuator networks
                                              (SEMI E54.12) by the Semiconductor
                                              Equipment Manufacturers Institute

July 2001                             First public CC-Link Conformance Test facility
                                              established.

March - August 2001          CC-Link is exhibited at 6 major global events
                                              These events demonstrated the openness of
                                              CC-Link and confirmed the advantages of 
                                              multiple global offices

November 2001                  CC-Link is exhibited at the System Control Fair Japan
                                                         Number of visitors to booth exceeds 10,000

December 2001                 CC-Link is exhibited at Semicon - Japan 2001
                                                         Number of visitors to booth exceeds 10,000

March 2002                         The number of CC-Link products shipped
                                              breaks the 1 million barrier

April 2002                            CC-Link/LT Protocol Specification is released
                                              This new bit-level protocol is compatible with CC-Link
                                              and provides for more efficient sensor level control
                                              This is the second network in the CC-Link Integrated
                                              Open-Technology Network family

August 2002                        First CC-Link Conformance Test facility outside
                                              of Japan is established at CLPA - Americas
                                              HQ in the United States

November 2002                  Version 2.0 (V2) of CC-Link Protocol Specification
                                              is released.  This new version increases reception
                                              and transmission data capacity by eight fold

December 2002                 CC-Link solution for EES is demonstrated

March 2003                         The number of CC-Link products shipped
                                              exceeds 1.5 million

July 2003                              The number of CLPA Partners exceeds 500

November 2003                   CC-Link Safety concept is announced

March 2004                          The number of CC-Link products shipped
                                               breaks the 2 million barrier

October 2004                       CC-Link Safety network Working Group is
                                               established to define specifications

March 2005                          The number of CC-Link products shipped
                                               exceeds 2.7 million

May 2005                              CC-Link is recognized as a China National
                                               Standard GB/Z (GB/T 19760-2005)

October 2005                       The number of CC-Link products shipped
                                               exceeds 3 million
                                               The number of CLPA Partners reaches 700
                                               The number of CC-Link compatible products
                                               reaches 700

November 2005                   CLPA Celebrates it 5th Anniversary

April 2006                             CC-Link is recognized as an ISO International 
                                               Standard  ISO 15745-5

October 2006                        CC-Link Safety Protocol Specification is released
                                                This new Safety protocol is compatible with CC-Link
                                                and provides for approved Safety network control
                                                This is the third network in the CC-Link Integrated
                                                Open-Technology Network family

December 2006                  The number of CLPA Partners reaches 750
                                               The number of CC-Link compatible products
                                               reaches 750

February 2007                     The number of CC-Link products shipped
                                               exceeds 4 million

March 2007                          CC-Link along with CC-Link Safety & CC-Link/LT
                                               are exhibited at the North American Robot Safety 
                                               Conference

October 2007                       CC-Link IE Control introduced.  The first Open 
                                               Automation network that operates at 1Gbps.

December 2007                  CC-Link is recognized as an IEC International 
                                               Standard  61158, 61784.

March 2008                          The number of CLPA Partners exceeds 1000
                                               CC-Link is certified as a Korean National Standard
                                               KS (KSBISO15745-5)

May 2009                              CC-Link is certified as a Taiwan CNS Standard
                                               CNS15252X6068

June 2009                            CC-Link is recognized as a China National
                                               Standard GB/T (GB/T 19760-2008)

August 2009                        The number of CLPA Partners exceeds 1000
                                              The number of CC-Link compatible products
                                               exceeds 1000

November 2009                  CC-Link IE Field is introduced.  The first Open
                                              Automation field network that operates at 1Gbps.

March 2010                         The number of CLPA Partners exceeds 1300

TOP


TOP